Independent representative

A rotating drum cannot hold the mix this job needs.

Rapid-set starts hydrating in the barrel. Latex-modified overlay has a short working window and a ratio you meter, not guess. Shotcrete has to match the nozzle, not the truckload. Mix on site, on demand, at the ratio the pour calls for — with nothing returned.

11yd³
Largest published bin
90yd³/hr
Peak line production
7sec
to produce mixed concrete
6
Models, 3 series

Applications

Jobs a rotating drum cannot do cleanly

Bridge decks, night lane-returns, shotcrete, scattered municipal pours, remote sites, and work too small to justify a barrel load. Each is a different buyer with a different constraint.

Bridge deck & latex-modified overlays

Latex-modified overlay has a working window measured in minutes, not hours, and the polymer dose has to hit the design — not close enough. A drum truck is already hydrating when it leaves the plant. Volumetric metering puts the latex in at the pour, at the ratio the deck called for.

Rapid-set & DOT lane returns

Fast-set and CSA mixes start hydrating the moment water hits cement. They will not survive a haul in a rotating drum, and a night lane-return does not wait on a batch plant. Mix on site against the reopen time, not against the truck clock.

Shotcrete & gunite

Pool shells, retaining walls, and slope work run at the nozzle. A barrel load is the wrong unit — too much, then nothing. Continuous supply at a controlled rate keeps the crew shooting instead of waiting on the next truck.

Municipal & DOT maintenance

A city or county crew does many small pours across scattered sites in a day. Full barrel loads for that work are waste: short-load fees on the way in, returned concrete on the way out. Mix what the stop needs, then move.

Mining & remote sites

When the nearest ready-mix plant is a long haul — or there is not one — a drum truck is not a plan. Pads, haul roads, and plant foundations need concrete that has not already set in transit. Carry the materials dry and mix at the hole.

Small-pour & low-volume work

The job is a few yards, not a truckload. Short-load fees and returned concrete eat the margin on work that should have been simple. Pay for what you place. Unused material stays dry in the bins.

StarMix

The line I represent

StarMix plants carry sand, stone, cement, water and admixture dry, and mix at the discharge. That is how a night lane-return, a latex-modified overlay, or a shotcrete crew gets the ratio the job called for — without a returned load.

Six models across three series. Specs are manufacturer-published and confirmed on the written quote. Se habla español.

Photo — volumetric plant discharging on site
Recommended 900×1200

After the sale

Parts and support

Genuine SMI components, operator training, and a parts desk that still answers when the unit is two years in. Calibration and mix design are what stand between a good pour and a rejected one — that is the support, not a ticket queue.

Also

Equipment and parts sourcing

A secondary desk for used units, surplus machines, and numbers the counter has already given up on. Not a second manufacturer line — one person who will make the calls when the catalog ends.

How sourcing works

Tell me the pour, not the model number

Application, typical load, and when you need to be placing. I will come back with a real spec and a real number.

Se habla español. Sales, training, and support in Spanish.